AINA Intelligence-OS → Academy — live board
Generated 2026-08-04 17:28 EDT · source commit 2d418341 · counts cover the ACTIVE program only; legacy sections reconciled 2026-08-04 per docs/reports/2026-08-04-board-reconciliation-ledger.md
✅ done 0🟡 in progress 0
⚪ todo 17🔴 blocked 0
Mission. Intelligence-OS is THE PRODUCT CORE: a certified, evidence-backed map of work
(236,736 census-profile payloads · 1,371,985 resolver rows · 58,237 weighted
grounding edges · full wage/skill/workflow/industry/geo/adoption layers)
served behind a versioned, pinned, zero-runtime-LLM contract. The academy is a
THIN CONSUMER wrapper (curriculum + trust UX). PERSONALIZATION is the flagship
feature (deeptutor + Cloudflare-vision docs): resolve→confirm→serve, universal-
first floor, never confidently wrong. Target: estate-powered friends flag, then GA.
Live lane activity
- 2026-08-04 17:40 Lane 08 RETRY — first attempt died on VDS disk-full (100%); reclaimed lane worktrees to 3.6G free; Terra round 3 relaunched
- 2026-08-04 17:30 Lane 08 gpt-5.6-terra — S1 review round 3 RUNNING on c46b8e04
- 2026-08-04 17:22 Lane 07 gpt-5.6-luna — S1 fixup round 3 BUILD-COMPLETE: all 3 round-2 P1s closed with falsifying tests; 50/50 + 6/6 + typecheck green in fresh worktree (c46b8e04)
- 2026-08-04 17:20 Lane 07 gpt-5.6-luna — S1 fixup round 3 RUNNING (campaign-scope tightening, wrangler.toml-parsed workflow assertion, 2 newly-found routes)
- 2026-08-04 17:10 Lane 06 gpt-5.6-terra — S1 re-review round 2: BLOCK (token-only campaign scope bypass; workflow asserts literals not parsed config; 2 more unguarded routes found)
- 2026-08-04 17:10 Lane 06 gpt-5.6-terra — S1 re-review round 2 RUNNING on exact head 75ddb8ef
- 2026-08-04 17:05 Lane 05 gpt-5.6-luna — S1 fixup BUILD-COMPLETE: all 4 alternate mutation routes closed, 44/44 tests in fresh worktree (75ddb8ef)
- 2026-08-04 16:52 Lane 04 gpt-5.6-terra — S1 review round 1: BLOCK (deploy.yml + 3 E2E writers + backfill bypassed guard) — all findings accepted, fixup dispatched
- 2026-08-04 16:47 Lane 03 gpt-5.6-luna — S1 exact D1 pair guard BUILD-COMPLETE on branch codex/dat151-s1-d1-guard-2026-08-04 (ee8beb1e)
- 2026-08-04 16:42 Lane 02 gpt-5.6-luna — fn-1..fn-11 reconciliation dossier complete; applied to board (ledger in docs/reports/)
- 2026-08-04 16:33 Lane 01 gpt-5.6-terra — plan review: BLOCK (7 findings) — all accepted, specs corrected
- 2026-08-04 16:20 flow-next install completed (rail in CLAUDE.md/AGENTS.md, founder-approved); board + Cloudflare page live
M-VIS: visibility rail — live flow-next board on Cloudflare + board reconciliation0/3 done · open · ACTIVE PROGRAM
- todo board renderer + first Cloudflare Pages deploy (aina-flow-board)
- todo reconcile stale fn-1..fn-11 board content against landed reality
- todo standing rule: republish board page at every RUNLOG checkpoint
M-D22: Wave-3 D22 grounding-label promotion (founder-gated release lane)0/5 done · open · ACTIVE PROGRAM
- todo GATE: founder release decision (blocks lane)
- todo cut new versioned census export incl grounding_labels (July-24 immutable)
- todo strict-JSON + 5 semantic samples on new export (Luna)
- todo independent Terra certification
- todo Academy pin decision + PR (own step)
M-STAGE: DAT-151 staging campaign resume — guard → creds → campaign → promotion package0/9 done · open · ACTIVE PROGRAM
- todo S1 P0: exact D1 name+ID positive guard + wrong-target fail-closed test (Luna builds · Terra verifies)
- todo S2: provision authorized staging credentials (CF token · Clerk 5-ID · PostHog · GitHub staging env · Phase 3 inputs)
- todo S3: seed isolated campaign D1 + Time Travel bookmark + provider-off Phase 3 baseline
- todo S4: all-on staging campaign + 5-identity journeys + privacy/erasure + observability + 5 output inspections
- todo S5: EXACT rollback + restoration proof (baseline parity: worker version/traffic, D1, 3 shared KV; stop on external drift)
- todo S6: provider-off recollection + independent Luna semantic review + Terra adversarial review (post-rollback)
- todo S7: Phase 4 immutable promotion manifest + dry-run only
- todo S8: Phase 5 retirement — separately gated per candidate (manifest + backup + RECOVERY REHEARSAL + canary; non-conclusive → packet only)
- todo S9: Phase 6 closeout (docs/PR/Linear/board, synced mains, one clean exit)
M4b: academy logic completion — audit ALL DER-era/stale paths once, fix in planned batches3/3 done · open · LEGACY — reconciled 2026-08-04; open items are genuine carry-forwards (see ledger)
- done Terra audit: complete inventory of DER-era/stale/pre-contract logic (read-only report + batch fix plan)
- done Fix batches 1-4 per audit plan (codex lanes, dependency order, lead-verified each)
- done Receipt verification-debt: 15 needs_fixes receipts (ACAD-164 A3-A9, AIN-100..564, FINCH-243) keep launch-path red — verify each independently via lanes or formally park with Ali ruling
M9: estate data-product stewardship (dashboard · cold storage · team access · BQ+Gemini self-serve)1/5 done · open · LEGACY — reconciled 2026-08-04; open items are genuine carry-forwards (see ledger)
- todo Dashboard refresh discipline: companion estate page + tracker artifact refreshed at every milestone close (live-probe numbers only)
- todo Cold storage: export-receipt + move empty/superseded tables per fn-3 pattern (superset proof before any delete)
- todo Paperclip team access: publishable-tier reference docs for marketing/SEO/content/research/curriculum (license gate enforced)
- todo BQ+Gemini self-serve evaluation: Data Insights / NL-query / read-only estate-explorer views (build only on demand)
- done Lineage tagging: classify all 643 tables active-input / legacy-superseded / contract-unprojected / orphan (from bq-inventory CSV + trio assessments)
M0R: July re-verification + first-principles realignment (Ali doubt 2026-07-24)5/5 done · open · LEGACY — reconciled 2026-08-04; open items are genuine carry-forwards (see ledger)
- done R1: full BQ inventory scan — every dataset/table, rows + last_modified, diffed vs estate-map claims
- done R2: RUNLOG full July read (personal, lead) — every claim vs live receipts
- done R3: repo docs/specs/ops sweep — forgotten work + details lying around outside canon
- done R4: agentsview transcripts audit (July, all intel-os sessions) — what was actually done vs marked
- done R5: first-principles realignment doc + board correction (gates fn-2.1 and fn-4.2 re-dispatch)
M8 launch: friends flag then GA (founder gates)0/3 done · open · LEGACY — reconciled 2026-08-04; open items are genuine carry-forwards (see ledger)
- todo Friends flag: 7d stability + 10 loops evidence pack -> founder flip
- todo GA ramp 5/25/100 with rollback ladder
- todo Post-launch flags: publication artifacts + tutor/evaluator
M7 career mobility (LAST, founder-gated)0/2 done · open · LEGACY — reconciled 2026-08-04; open items are genuine carry-forwards (see ledger)
- todo Credential-gate model + semantic eval on mobility edges
- todo Founder re-ratification packet for mobility
M6 evidence + affordance completion (citations, human_must, exposure)0/4 done · open · LEGACY — reconciled 2026-08-04; open items are genuine carry-forwards (see ledger)
- todo S2c citations manifest + /evidence route live + cert update
- todo DAT-153 human_must ruling on new per-task tags (founder)
- todo Industry receipts verify -> PUBLIC or documented-held
- todo DAT-150 exposure overlay into universal lesson (gated)
M5 ratification completion (Batch-B/C + P-001)0/4 done · open · LEGACY — reconciled 2026-08-04; open items are genuine carry-forwards (see ledger)
- todo Batch-B ratification (terra-gated, rollback pattern)
- todo Batch-C renames/merges + re-batch + ratify
- todo P-001 disposition process + first tranche
- todo Operations Managers split/rename + ratify
M4 title-resolution completion (contested + variants)1/4 done · open · LEGACY — reconciled 2026-08-04; open items are genuine carry-forwards (see ledger)
- in_progress Contested-tail batches (~16,144) by volume through Flash+corroboration gate
- todo Fold 596 missing title variants
- todo Marquee end-to-end confirmation (PPC + product manager)
- done R2b landed: verify-by-diff, merge, overlay live, eval green, PPC/PM outcomes
M3 retirement of superseded surfaces (receipts-first)1/3 done · open · LEGACY — reconciled 2026-08-04; open items are genuine carry-forwards (see ledger)
- todo Delete old worker/D1/DER wiring + retire-eligible BQ (superset receipts only)
- todo Docs/pointer sweep: zero references to retired surfaces
- done Export receipts: old D1 + bundle (sha256, preserved location)
M2 fresh contract cycle 2 (post-ratification+affordance)4/4 done · open · LEGACY — reconciled 2026-08-04; open items are genuine carry-forwards (see ledger)
- done Rebuild contract artifact from post-swap _served_v2 (new date name, freshness-gated)
- done Deploy fresh D1+worker, canary, cross-credential verify
- done Runtime cert v2 + affordance beta-gate revisit ruling
- done Academy pin bump to new contract (one-line PR)
M1 consumer path unblock + personalized E2E proof5/5 done · open · LEGACY — reconciled 2026-08-04; open items are genuine carry-forwards (see ledger)
- done Fix ACAD-177 batch-1 provenance truthfully; academy main green
- done Merge PR #288; staging deploy green
- done Personalized E2E r3 receipt (confident + contested + fail-closed)
- done Correction-queue + erasure smoke on staging
- done Root-cause the intermittent intake->resolve race (r6: primary universal while counterfactual resolved) BEFORE friends flag